by Karen | blinds, electrical, kitchen, lighting, moulding, paint, window
Our kitchen was the last room that needed crown moulding installed. We had delayed the installation because we weren’t sure how to connect the new crown moulding to the already existing kitchen cabinet crown moulding. The cabinet moulding is half the size of the...
by Karen | door, drywall, exhaust fan, master bathroom, moulding, paint, plumbing, second bathroom, tile, toilet, vanity |
Our master bathroom was the one room we didn’t remodel when we moved in. I knew I wanted to remodel the entire room so we wanted to wait for the right time so we could take our time and not feel rushed (like with the second bathroom remodel). Fast forward to...
by Karen | a/c, door, drywall, duct, electrical, exhaust fan, hardwood floors, heating, insulation, kitchen, master bathroom, moulding, paint, plumbing, roof, second bathroom, tile, toilet, vanity
Our first renovation began the day we closed escrow on our first home. We remodeled the entire house for three months before moving in. Mike did a lot of the demo himself since I had to watch our baby. DEMO DAY!: Mike removed everything in the kitchen, including...